MAJOR PROJECTSAL DUR SWRO PLANT

MAJOR PROJECTS

AL DUR SWRO PLANT

Consultant : Al Haya

Contractor : SEPCO 3

Duration : 18 months

Al Dur 2 SWRO plant, consists of two independent Seawater Reverse Osmosis (SWRO) desalination plants constructed in two phases which will total 227,300 m3/day. The project has a footprint of approximately 192,500m2, and is located immediately south of the existing Al Dur Phase I IWPP Plant, on the East coast in the Southern Governorate of the Kingdom of Bahrain.

  • TECHNOLOGIES SUPPLIED
  • Performance Grouting
  • Concrete Protection
  • Concrete Repair
  • Curing Compounds
  • Performance Flooring
  • Tile Fixing Systems
Al Dur SWRO plant

Get In Touch

Salmabad Office

Tel: +973 17 786 427

Fax: +973 17 786 450

[email protected]